Abstract quantitative risk field with bounded red control region

Independent control plane / Architecture v0

Risk begins
with a boundary.

PRT evaluates portfolio targets, proposed orders, actual positions and system state. It publishes an auditable decision. It never optimizes the portfolio or sends an order.

Inspect the mandate ↓
PCPT / PRT / PET
FAIL CLOSED
4Decision states
6MVP hard rules
1Global Kill Switch
0Broker authority

01 / Scientific control

Observe.
Evaluate.
Decide.

APPROVE

All deterministic policies pass for the requested operating mode.

CONDITION

The artifact may proceed only after explicit, machine-readable conditions are met.

REJECT

The request fails one or more policy limits and must be resubmitted.

HALT

An active Kill Switch or critical system state overrides every approval.

02 / Deterministic policy

Six rules before complexity.

PRT starts with rules that can be tested, replayed and explained. No black-box risk score can bypass a failed hard gate.

  1. 01Cash sufficiencyRequired cash cannot exceed available cash.
  2. 02Position concentrationSingle-security weight stays under its configured maximum.
  3. 03TradabilityUntradable securities are rejected before execution.
  4. 04Turnover limitDaily turnover remains within the approved operating envelope.
  5. 05Loss boundaryMaximum-loss breach pauses the strategy.
  6. 06Live lockLive trading requires an explicit, expiring Human unlock.
PRE-TRADE

Prevent invalid intent.

Cash, concentration, tradability, abnormal price, order value and turnover.

IN-TRADE

Control active execution.

Fill anomalies, price deviation, duplicate orders, connectivity, loss state and Kill Switch.

POST-TRADE

Reconcile and learn.

Positions, exposure, PnL attribution, costs, drawdown and immutable incident evidence.

03 / Human Authority

Automation cannot grant itself permission.

LIVE MODELOCKEDDefault state

Human approval is scoped, attributable and expiring. Kill Switch state remains globally dominant.

04 / System boundary

Risk crosses the production line.

PCPTPortfolio targetCandidate promotion
PRTRiskDecisionPolicy + authority
PETExecution stateOrders + positions

PRT consumes monitoring evidence from PAAT, PCPT and PET. It does not replace each Team's local monitor.